🎉 The #CandyDrop Futures Challenge is live — join now to share a 6 BTC prize pool!
📢 Post your futures trading experience on Gate Square with the event hashtag — $25 × 20 rewards are waiting!
🎁 $500 in futures trial vouchers up for grabs — 20 standout posts will win!
📅 Event Period: August 1, 2025, 15:00 – August 15, 2025, 19:00 (UTC+8)
👉 Event Link: https://www.gate.com/candy-drop/detail/BTC-98
Dare to trade. Dare to win.
The new generation of self-elevating offshore wind installation vessel has been completed and unveiled, with an effective payload of over 17,600 tons.
Golden Ten Data, August 15, today (August 15), at the Yangtze River Wharf in Qidong, Jiangsu, a new generation of jack-up offshore wind power installation ship built by COSCO Shipping Offshore in Qidong was completed. This offshore equipment with four "long legs" is the first NG20000-type wind power installation vessel customized by COSCO SHIPPING Offshore in Qidong for shipowners. The ship was not only "tall and long-legged", but also "infinitely powerful". It has a deck area of 5,600 square meters, a payload of more than 17,600 tons, and a main crane lifting capacity of more than 2,500 tons.